WRC 2007 Agenda Item Details

Agenda Item: Resolution 79
Resolution(s): Resolution 79
Description of work: Study the technical basis of coordination between RA stations operating in the 42.5 - 43.5 GHz band with HD-FS stations
Lead Working Party(s): WP 9D
Involved Working Parties: WP 7D, WP 9D
How Visualyse products can help: Visualyse Professional can model in detail HDFS systems in these bands including BFWA services (P-MP both base and user terminal plus mesh architectures). Visualyse Professional can calculate interference and PFD including aspects such as shielding, propagation over terrain using Rec. 452 and the aggregate effect of thousands of cells and millions of user terminals.
How Transfinite consultants can help: We can undertake studies including analysis of sharing between the services covered by this resolution, and identify suitable system characteristics and sharing criterias, and provide contributions and representation at relevant ITU-R Working Parties. We have extensive experience in this issue from a series of studies that have led to the development of PNDRs.
Previous Next