WRC 2003 Agenda Item Details
| Agenda Item: | [Resolution 75] |
| Resolution(s): | Resolution 75 (COM 5-11) |
| Description of work: | Develop the technical basis for determining the coordination area for coordination of RX ES in the space research service with transmitting stations from HD-FS in the 31.8 - 32.3 GHz and 37 - 38 GHz bands. |
| Lead Study Group:: | SG 1 |
| Working Parties: | WP 7E, WP 9D, TG 1/6 |
| How Visualyse products can help: | Visualyse can calculate coordination contours around and earth station based upon Appendix S7 and do detailed interference calculations using ITU-R Rec. 452 to include the propagation effects of terrain. There are no limits to the number of stations that Visualyse can model so large numbers of HD FS stations |
| Previous | Next |